This is an old revision of the document!
Finca Verde - Farm Log
Date | Activity | Time | Cost |
---|---|---|---|
25th October 2023 | First Snow melt irrigation run, work include preparing the acequia, monitoring the water inflow and outflow, clearing up debris and opening and closing irrigation pipes. | 1900 - 0400 | V 90 |
1st February 2025 | Burned cuttings at the two burning circles at the far end of the farm. | 1000 - 1400 | 20 |
14th February 2025 | Cleaned pipe coming from under the sink until the end of the terrace to facilitate fire bucket filling at the end of the terrace near the burning circles. | 0830 - 1400 | |
14th February 2025 | Burned cuttings at the two burning circles at the far end of the farm. | 1000 - 1400 | 20 |
14th February 2025 | Irrigation - Refilled domestic tank, followed by redirection of irrigation water into Frescito side of the farm. Maintained the half-way switch open to water bottom half of the land. | 1100 - 1900 | |
14th February 2025 | Continuing work to trim the olive tree suckers. | 1200 - 1600 | 30 |
15th February 2025 | Irrigation - Topped up the domestic tank to cope with extra load from volunteers and Warm Showers visitors and then opened all pipes for 4 hours to water all trees. After 4 hours closed all but under the sink switches to let the water deposit re-fill. Closed under the sink tap at 0700 the following morning and then topped up the domestic tank once more as more showering was happening. | 1900 - 0700 | |
17th February 2025 | Continuing work to trim the olive tree suckers. | 1200 - 1600 | 30 |
18th February 2025 | Continuing work to trim the olive tree suckers. | 1200 - 1600 | 30 |
19th February 2025 | Continuing work to trim the olive tree suckers. Jose Louis land completed, continuing work up to Frescito land. | 1200 - 1600 | 30 |
20th February 2025 | Continuing work to trim the olive tree suckers. | 1200 - 1600 | 30 |