25th October 2023 First Snow melt irrigation run, work include preparing the acequia, monitoring the water inflow and outflow, clearing up debris and opening and closing irrigation pipes. 1900 - 0400 V 90
1st February 2025 Burned cuttings at the two burning circles at the far end of the farm. 1000 - 1400 20
14th February 2025 Cleaned pipe coming from under the sink until the end of the terrace to facilitate fire bucket filling at the end of the terrace near the burning circles. 0830 - 1400
14th February 2025 Burned cuttings at the two burning circles at the far end of the farm. 1000 - 1400 20
14th February 2025 Irrigation - Refilled domestic tank, followed by redirection of irrigation water into Frescito side of the farm. Maintained the half-way switch open to water bottom half of the land. 1100 - 1900
14th February 2025 Continuing work to trim the olive tree suckers. 1200 - 1600 30
15th February 2025 Irrigation - Topped up the domestic tank to cope with extra load from volunteers and Warm Showers visitors and then opened all pipes for 4 hours to water all trees. After 4 hours closed all but under the sink switches to let the water deposit re-fill. Closed under the sink tap at 0700 the following morning and then topped up the domestic tank once more as more showering was happening. 1900 - 0700
17th February 2025 Continuing work to trim the olive tree suckers. 1200 - 1600 30
18th February 2025 Continuing work to trim the olive tree suckers. 1200 - 1600 30
19th February 2025 Continuing work to trim the olive tree suckers. Jose Louis land completed, continuing work up to Frescito land. 1200 - 1600 30
20th February 2025 Continuing work to trim the olive tree suckers. 1200 - 1600 30