finca_verde:south_side

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Last revisionBoth sides next revision
finca_verde:south_side [2022/06/21 20:30] – created aimeejuliafinca_verde:south_side [2022/06/21 20:46] – [Land Management] charlie.wilson887
Line 2: Line 2:
  
 ===== Land Management ===== ===== Land Management =====
 +
 +My name is Charlie. I am from the UK and have been living in Orgiva for 1 year. I am volunteering at the Finca Verde for 3 weeks. It is now June and very hot in Southern Spain. I have been doing my personal online work during the day times and doing some clearing on the terraces of the South side during the evenings. 
 +
 +I have been using a small scythe and some gardening gloves. I have been taking a small basket to collect oranges and lemons. I have had to wear jeans to cover my legs. I didn't wear a long sleeve top, but other people might prefer to do so. I usually start the clearing work around 7:30 pm, when it is cool outside. On average I work 90 minutes per day. 
 +
 +It took me 12 days to clear all of the terraces on the South side and the bottom of the valley where the orange trees are located. This comes to 18 hours. The top terraces had a lot of sticks that needed to be put into piles. This work can be done pretty quickly. The lower terraces had a lot of scrub and overgrown plants that needed clearing. This takes longer. 
 +
 +I put all of the sticks and gathered them in piles by the side of the terraces. I put a lot of the scrub on these piles also. Some of it I cut and left where it was, to turn into mulch. 
 +
  
  
  • finca_verde/south_side.txt
  • Last modified: 2022/06/21 20:51
  • by charlie.wilson887