This project is about researching and implementing an hydroelectric solution for the Kuckucksmühle (Kum).
Produce electric energy for infrastructure or services of Kum.
Powering sets of small computers for providing dedicated servers for small applications 100% renewable.
Measuring the water level over a year. Implementing a water flow meter that is non intrusive.
First Ideas:
A camera that makes photos every hour and calculates the amount of water flowing through by hight of the water level exiting the tunnel of the bridge.