====== Hydroelectirc wheel at Kuckucksmuehle ====== ===== Description ===== This project is about researching and implementing an hydroelectric solution for the Kuckucksmühle (Kum). ===== Constraints ===== * Legal issues (the right to use the water) * Water needs to continuously flowing (at the moment a beaver damn ensures that) but officially there is no creek on the map anymore * foundation of the mill and structure of the building needs to be checked for suitability and/or restoration of it. ===== Goals ===== Produce electric energy for infrastructure or services of Kum. ===== Ideas for usage ===== Powering sets of small computers for providing dedicated servers for small applications 100% renewable. ===== Research needed ===== ==== How much water do we have? How much energy can we harvest from that? ==== Measuring the water level over a year. Implementing a water flow meter that is non intrusive. First Ideas: A camera that makes photos every hour and calculates the amount of water flowing through by hight of the water level exiting the tunnel of the bridge.